Skip to content

Sourcing

The 12-Point Supplier Qualification Checklist for Industrial Buyers

A structured way to qualify a new manufacturing supplier without flying there — covering capacity, quality systems, traceability and exit risk.

By Sofia Almeida · Export Director9 min readPublished 2026-08-21

Most supplier failures are visible before the first order — in documents, not in production. This checklist is the one we recommend to buyers qualifying a new machining, casting or fabrication partner. It can be completed remotely with a drawing package, a video walk-through and three documents.

Commercial and capacity checks

  • 1. Can they prove the annual volume you need, on machines they own? Ask for a capacity calculation, not a brochure.
  • 2. What percentage of their output is exported, and to which countries? Export experience shows in documentation quality.
  • 3. Who is your named contact, and are they an engineer or a sales rep? Escalation paths matter more than response speed.
  • 4. What happens to your price if raw material moves 15%? A written formula is a sign of a managed business.

Quality system checks

  • 5. Which certifications are in scope for your process, and can they show the current certificate with the scope statement?
  • 6. How do they inspect a critical dimension — CMM, gauge, or by eye? Ask for a sample inspection report with actual values.
  • 7. Can they trace a finished part back to its heat number and inspection record? Ask them to demonstrate one.
  • 8. What is their change-notification process? A supplier that can change a process silently is a liability.

Delivery and exit-risk checks

  • 9. What is their measured on-time delivery for the last 12 months, and how is it calculated?
  • 10. Who owns the tooling, and what is the release procedure if you leave? Get it in writing before paying for a die.
  • 11. How do they protect drawings and IP? NDA, access control, no unauthorised photography.
  • 12. What happens in a capacity crisis — who gets priority? Ask for their allocation rule, not a promise.

How to verify without an audit

Ask for three things: a first-article inspection report for a part similar to yours, a live video call showing the machine running that part, and the material certificate for the heat used. Suppliers who can produce all three within a week are usually telling the truth about the rest. Suppliers who send a brochure instead are telling you something too.

A qualified supplier is not the one with the lowest price. It is the one whose failure modes you already understand.

If you want to run this checklist against TradeMax, send us a drawing and ask. We will return the FAI report, the machine video and the material certificate for the same part — and you can decide on evidence rather than a sales presentation.

Start a project

Send us your drawing. Get a real answer.

Upload a STEP, DWG or PDF drawing and our engineering team will return a feasibility review, tolerance feedback and indicative pricing within two business days.